|
In
answer to the growing
demands of the industry, we have invested in a new, dedicated oil
&
gas assembly and test facility to complement our existing manufacturing
capability. In the past, we have configured our assembly, clean room
and test areas to reflect the diet of work received. However, due to
continued and anticipated demand we
have expanded both assembly and
test in to a purpose built facility on our existing site. The new
facility will also house a 30,000psig pressure test unit and chart
recorder; a Rotex 14L/M hydraulic
flushing unit;
a Dynex 55L/M
hydraulic flushing rig with variable flow and pressure, and a Pall
particle counter PCM 400 monitor in addition to the Oil & Gas
assembly and fitting rigs.
The two pictures reflect our existing facility of +35,000 square feet
and the new area nearing completion.
|