New Assembly and Test Facility

In answer to the growing demands of the industry, we have invested in a new, dedicated oil & gas assembly and test facility to complement our existing manufacturing capability. In the past, we have configured our assembly, clean room and test areas to reflect the diet of work received. However, due to continued and anticipated demand we have expanded both assembly and test in to a purpose built facility on our existing site. The new facility will also house a 30,000psig pressure test unit and chart recorder; a Rotex 14L/M hydraulic flushing unit; a Dynex 55L/M hydraulic flushing rig with variable flow and pressure, and a Pall particle counter PCM 400 monitor in addition to the Oil & Gas assembly and fitting rigs.

The two pictures reflect our existing facility of +35,000 square feet and the new area nearing completion.